Search

27 items
Sort by:
Type de contenu

Ariane 6: main core and boosters at the launch pad

Another major milestone has been reached in the preparation schedule for the first Ariane 6 commercial flight: the transfer of the main core and boosters to the launch pad.

Go-ahead for the second Ariane 6 preparations

The components for the second Ariane 6 flight model have arrived in Kourou. Take a behind-the-scenes look at the preparation campaign in the run-up to lift-off, scheduled for mid-February 2025.

Vega-C makes a comeback

On 5 December, the Vega-C launcher returned to flight, successfully placing the Sentinel-1C satellite in orbit.

Ariane 6: first commercial flight in early 2025

ArianeGroup and Arianespace have announced that the first commercial flight of the European heavy-lift launch vehicle will take place in the first quarter of 2025.

First successful test flight for BalMan

On the night of 30 October 2024, the BalMan manoeuvring balloon successfully completed its first test flight from Europe’s Spaceport.

Preparing the BalMan balloon at Europe’s Spaceport

A stratospheric balloon, BalMan, will take off at night from Europe's Spaceport between 30 October and 15 November.

Successful lift-off for the last Vega mission

On the night of Wednesday 4 to Thursday 5 September 2024, the Sentinel-2C satellite was successfully placed in orbit by the last Vega launch vehicle.